SES are power plants that generate electricity using energy from the sun.
Solar energy systems are technological systems that convert sunlight into electricity. These systems typically include solar panels, inverters and battery storage. Solar panels capture light from the sun through photovoltaic cells and convert it into electrical energy. This electricity is then converted by inverters from direct current to alternating current, making it available for use in houses or businesses. At the same time, the solar energy system is often combined with battery storage units to provide electrical energy even when there is no sunlight. As a result, solar energy systems provide a clean, renewable and sustainable source of electricity, meeting energy needs while protecting the environment.
On Grid Systems
These are grid-connected systems that consume the electricity produced when the sun is shining and are fed from the grid when production is insufficient.
It is connected to the grid.
If there is more production than consumption, there is an opportunity to sell to the grid.
It is fed from the grid when there is no production or when production is falling.
The project design and approval process may take 3-4 months.
Hybrid Grid Systems
It is the same with the working logic of On Grid systems. The only difference is that a battery can be added to the inverter used for the Hybrid Grid System if needed later.
It is connected to the grid.
If there is more production than consumption, there is an opportunity to sell to the grid.
It is fed from the grid when there is no production or when production is falling.
The project design and approval process may take 3-4 months.
Hybrid Grid Systems Battery Included
A battery is also added to the system. The energy not used during the day is stored in the battery, and the energy stored in the battery is used instead of drawing energy from the grid during the evening hours when consumption is high.
It is connected to the grid.
If there is more production than consumption, there is an opportunity to sell to the grid
or store it in the battery.
If there is no production, or if production is decreasing, power is drawn first from the battery and then, if necessary, from the grid.
- The project design and approval process may take 3-4 months.
Off Grid Systems
It is usually preferred in places where there is no network access. It can also be installed where there is a grid. However, there is no sale or transfer of energy to the grid.
There is no need for the grid.
It does not feed energy into the grid.
However, if there is an opportunity to connect to the grid, it can receive energy.
If there is more production than consumption, it can be stored in the battery.
If there is no production or it is decreasing, it can be fed from the battery first and then from the grid if necessary.
There is no need for a project.
There is no paperwork for approval processes.
It is a plug and play system.
How does the installation process work?
We install the solar energy system on your roof in 5 stages:
1.
A survey to determine ; how much solar energy your home will produce, the amount of electricity your home uses and the technical suitability of your roof.
2.
In the quotation phase;a turnkey offer is prepared, including the hardware package, project design and installation, specially prepared for you according to the location and square metres of your roof, your consumption and your needs.
teklif oluşturulur.
3.
Permits and administrative procedures; if you are a user who wishes to sell excess electricity to the grid, Solino will take care of the permits, documents and administrative procedures required to carry out this sale on your behalf.
4.
Installation; Solar panels, inverters, construction and any equipment used in the system are supplied and installed specifically for the project. Roof specific engineering details are analysed by our expert engineers. The installation of the system is completed using the best engineering solution.
5.
Technical service :The maintenance of our system installed in your home for 1 year is carried out by our Solino Technical Service teams consisting of our expert engineers. After 1 year, your systems will be checked 2 times a year as part of our Maintenance & Service Agreement.
Let our teams serving in 81 provinces of Turkey propose your project.
Fill in our form and our energy consultants will call you.
Thank you for your interest!
We apologize, but we do not provide services to apartment units.
Thank you for your interest!
We're sorry, but we're unable to provide service due to your average bill.
An unexpected error occurred, please try again later.